Kingdom Centre Riyadh: Curved PVD Cladding across Six Viewing Platforms

By

Xinmao supplied XM-1617 PVD stainless steel decorative cladding for six curved viewing-platform assemblies at Kingdom Centre Riyadh. A partner contractor provided the load-bearing frames.

For the Kingdom Centre Mall refurbishment, Xinmao Metal supplied decorative stainless steel cladding for six viewing-platform assemblies, together with column covers, portals and handrail edging. A partner contractor was responsible for the load-bearing frames; Xinmao’s scope was the visible metal finish.

Kingdom Centre Mall design visualisation showing gold circular viewing platforms in a bright retail atrium
Project visualisation: the new circular viewing platforms bring a warm metallic line into the open atrium.

ProjectKingdom Centre Mall renovation

LocationRiyadh, Saudi Arabia

ScopeCustom stainless steel architectural metalwork

Fabrication timeApproximately one month

A renewal programme with a demanding brief

Kingdom Centre Mall is a high-traffic commercial environment where the architectural finish has to work at several scales. It needs to read from across a large atrium, sit comfortably beside retail frontages and lighting, and still feel resolved when a visitor is standing at a railing or passing an entrance column. The client’s renovation brief centred on six new viewing platforms, then extended into the stainless steel components that connect the public spaces: entrance columns, handrail borders, decorative trims, portal cladding and related architectural details.

The project value was approximately USD 1 million. That number matters less here as a sales point than as an indication of coordination: this was not a single feature piece. It was a package of visible elements that had to share one colour, one geometry language and one installation logic while fitting into an operating commercial setting.

The platform cladding used XM-1617 gold PVD on 304 stainless steel. The finish helped the curved metal bands catch the warm lighting without turning them into mirror surfaces. Related gold details on columns, portals and handrail edges carried that visual language through the renovation.

Design visualisation of gold stainless steel curved structures in a Kingdom Centre Mall interior
Project visualisation: curved metal structures establish a focal point within the mall interior.
Design visualisation of a mall entrance with stainless steel column cladding
Project visualisation: column and portal cladding at an entrance condition.

Six viewing platforms, not six standard units

Each platform’s decorative cladding needed a measured interface with the supporting frame supplied by the partner contractor. The fabrication drawings tracked the panel grid, curved edges, joints and fixing locations so the visible metal could be installed around the separate structure.

The six layered viewing platforms are the visual centre of the renovation. The supplied plan for one platform measures 8,260 × 4,408 mm, with 26.41 m² of decorative metal coverage per platform. Across the project, the curved cladding was divided into 144 panels; the largest individual panel covers 3 m². The curved lines had to continue across each joint without making the separate modules obvious from the atrium.

Drawings and three-dimensional models helped resolve the oval cladding geometry and its interface with the partner’s load-bearing frame. They also allowed the panel positions and installation sequence to be checked before the visible metal was shipped.

Oval plan drawing for a Kingdom Centre Mall viewing platform
Engineering drawing: oval plan and interface dimensions for a platform configuration.
Three dimensional engineering model of layered oval viewing platform
Engineering model: three stacked curved rings, supports and internal framing.

Complex curvature changes the manufacturing conversation

Curved stainless-steel panels should be formed with controlled rolling or matched-radius tooling, then checked against templates or a trial assembly. The visible quality depends on more than the curve itself: panel seam placement, folded returns, backing, support-plane accuracy and the direction of reflected light all affect whether the surface reads as one continuous line. Forced site bending and heavy local grinding are poor substitutes for verified shop geometry.

Where a gold PVD finish is used, final forming, welding and surface repair normally precede coating. The physical control sample should set colour, gloss, base texture and allowable variation under the actual lighting. PVD is a thin physical vapour deposition finish. It does not hide substrate defects and cannot be treated as a corrosion upgrade to the selected stainless grade.

The decorative platform cladding required controlled curved fabrication. Each visible panel was made from 1.5 mm 304 stainless steel, and the approved gold PVD finish was XM-1617. The team needed to control the shape of each segment while maintaining a continuous line around the finished platforms.

The renovation also included column wrapping and portal cladding. These areas introduced a different type of complexity: existing architectural conditions, vertical surfaces, transitions to ceilings and the need to keep the metal surface visually calm. The proposal used curved stainless steel honeycomb panels over structural framing for selected cladding conditions. This approach supports a clean architectural skin while accommodating the required build-up behind it.

The PVD gold finish added another coordination requirement. Gold is unforgiving when adjacent segments do not align visually. Joint placement, edge treatment and the direction of the finished surface all needed consideration before installation. The goal was not to hide every technical connection at any cost; it was to put the connections where they would support a disciplined reading of the architecture.

At the platform edges, light becomes part of that reading. The curved bands sit alongside integrated illumination and the surrounding white architecture, so their proportion had to be judged in context rather than as isolated metal samples. A surface can look correct on a bench and feel too heavy once it has been repeated around a large open void. Reviewing the geometry, the finish and the lighting relationship together helped keep the gold tone present without allowing it to dominate the wider renovation.

Exploded installation drawing of stainless steel honeycomb panel column cladding
Engineering drawing: panelised column cladding, backing frame and connection logic.

One month of fabrication, then a deliberate test before shipping

A pre-shipment trial is useful when panel geometry and public sightlines are demanding. The inspection can check module numbers, curve continuity, joint rhythm, opening positions, protective-film condition, fixing locations and the sequence for lifting and installation. It is also the right point to compare the finished work with the signed sample, rather than relying on a colour name or a small offcut.

The manufacturing period was approximately one month. With complex architectural metalwork, a short production window only works when installation questions are resolved early enough to be tested in the factory. For this project, the assemblies were pre-installed in the workshop before shipment. That step allowed the team to verify the relationships between curved stainless steel segments, support structure and connection points before the work reached Saudi Arabia.

Pre-assembly is particularly valuable for renovation work. Existing buildings bring constraints that are difficult to understand from a single drawing alone: access routes, ceiling interfaces, site tolerances and the practical order in which parts can be lifted and fixed. Testing the assemblies beforehand reduces the number of unknowns arriving on site. It also gives installers a clearer sequence and a reference for checking parts as they are unpacked.

For projects with repeated curved assemblies, the visual result depends on the installation sequence as much as the fabrication. A factory pre-assembly turns that sequence into something the project team can examine before export.

The available site photographs show the installation stage, including the protective film still on some curved panels. This is useful evidence of the process rather than material for a glossy before-and-after claim. You can see the layered ring components in position, the cladding ready to be completed, and the relationship between the new work and the mall’s existing levels.

On-site installation of a curved stainless steel viewing platform at Kingdom Centre Mall
On-site installation record: curved platform structure and protective film in place.
On-site view of layered circular stainless steel platform components
On-site installation record: the layered curved form is assembled within the existing atrium.

Installation that followed the preparation

Installation drawings should identify the load path, adjustable brackets, anchor zones, edge distances, panel weights and maintenance access. In exterior-facing or frequently cleaned areas, drainage and dissimilar-metal isolation need the same attention as the visible finish. The installed system should be inspected for secure fixings, consistent joints, undamaged surfaces and any approved site adjustment recorded for handover.

Once the decorative components arrived on site, the earlier trial assembly gave installers a known sequence for the curved cladding and its fixing points. The platform load-bearing frames were the partner contractor’s scope, so final structural acceptance belongs to that separately engineered system.

The project also demonstrates why stainless steel remains useful in commercial refurbishment. It can be shaped into strong visual gestures, but it can also work as a precise finishing material around existing structures. In this mall, the same material family moves from large sculptural platform rings to column skins, portal elements and handrail borders. The scale changes; the fabrication discipline does not.

On-site view from below of layered ring shaped stainless steel structure
On-site installation record: underside view of the layered ring assembly.
On-site view of tall curved stainless steel architectural feature at Kingdom Centre Mall
On-site installation record: a tall curved stainless steel feature within the mall.

What this case means for future mall renovations

There is a practical lesson in the Kingdom Centre Mall package. Large commercial renovations rarely ask for a single off-the-shelf product. They ask for a system: a finish that suits the design language, fabrication that can follow complex geometry, and a route from workshop to site that does not leave the difficult decisions until the last week.

For architects, contractors and project owners planning similar work, the starting information is straightforward: drawings or dimensions, the installation location, the target finish, quantities and the required programme. From there, a custom stainless steel package can be developed around the actual interfaces of the building. Complex curves, PVD colour and panelised cladding all become more manageable when they are treated as engineering decisions from the beginning.

Project type Commercial mall renovation and refurbishment
Primary feature Six custom multi-tier viewing platforms with curved stainless steel elements
Additional scope Column cladding, portal details, handrail edging and decorative architectural metalwork
Finish PVD gold stainless steel
Delivery approach Workshop pre-assembly before shipment and site installation

The completed decorative cladding established the intended gold lines across the platforms and adjoining mall details. The project illustrates a practical sequence for complex curved metal: resolve the geometry, check the panel fit in the workshop, then coordinate installation with the contractor responsible for the supporting structure.

Site installation video from the Kingdom Centre Mall project.

Records that support final acceptance

The handover file should link installed modules to approved drawings and inspection records. Depending on the scope, it can include material certificates, signed finish samples, panel numbering, dimensional checks, pre-assembly photographs, fixing inspections and approved site-adjustment records. Structural, fire and acoustic claims must relate to the engineered or tested full assembly, not to the visible sheet in isolation.

Planning a commercial stainless steel renovation?

Send Xinmao Metal your drawings, site dimensions, finish requirements and target delivery date. Our team can review curved cladding, architectural trims and other decorative stainless steel elements, including their interfaces with separately engineered structures.

Request a project quote