Which worksheet should I start with?
Start with the Project RFQ if you are preparing a new enquiry. Use the finish, survey, technical review, inspection and handover records when those tasks become relevant. One project may use several documents.
Are these completed certificates or test reports?
No. These are blank worksheets for organising project information. Material certificates, test reports, calculations and approval records must relate to the actual supplied materials, construction and intended application.
Can I use these files for different products?
The general worksheets cover several architectural metalwork families, with product-specific prompts where needed. The honeycomb submittal worksheet is intended for honeycomb composite panels. Complete only the applicable sections and explain any exclusions.
Does completing a worksheet approve fabrication?
Completion alone does not release production. Use the agreed approval process, current drawings, accepted references and authorised release records. Typed names identify participants but do not create a digital signature.
Why do I need to provide my contact details?
The contact form lets Xinmao Metal record your resource request and contact you about relevant project support. After a successful submission, your selected worksheet is available immediately, together with access to the other worksheets during this visit.
Will the PDF save my entries?
Use a compatible PDF reader and save a completed copy before closing the file. Reopen it to check the entries. If the browser viewer does not support form saving, download the PDF and open it in a suitable reader.
How do I send the completed worksheet?
Use the communication channel agreed with the Xinmao Metal team. For a new enquiry, contact us first to confirm the recipient and how to share drawings or larger attachments.