Custom stainless steel elevator interiors
Brushed Stainless Steel Elevator Cabin Wall Panels
Brushed stainless steel decorative cab panels provide a restrained elevator interior, with panel layout, weight and interfaces coordinated with the lift contractor.
Product description+
Brushed stainless steel wall-facing panels give this passenger-lift cabin a restrained, easy-to-maintain metal interior. The references also show handrails and a luminous ceiling; those elements are coordinated with the lift and electrical teams rather than assumed to be part of the panel supply.
For retail or other high-traffic interiors, Xinmao Metal can develop removable decorative cab panels from the approved dimensions and grain direction. The lift supplier sets the added-weight allowance; panel build-up and estimated weight are submitted for review before fabrication. Check handrail reinforcement and service access on the equipment drawings. Clean the approved steel finish with water and a soft cloth; avoid chlorine-containing or abrasive cleaners.
Project Questions
Can elevator wall panels be replaced without replacing the whole cab?
Decorative panel replacement may be possible after checking the existing shell, dimensions, clearances and fixing system with the elevator contractor. Use a compatible panel package.
What information is needed for a panel quotation?
Provide cab drawings, dimensions, quantities, finish references, required components and confirmed weight and clearance allowances, plus the destination and delivery programme.
Interior package scope+
Cabin wall panels, doors, jambs, ceilings, skirting, trims and selected feature elements can be coordinated around approved elevator supplier information.
Information for review+
- Obtain the lift contractor's approval of cab measurements, panel build-up, added weight and clearances before manufacture or replacement. Decorative facing must not alter the lift's safety or operating systems.
- Coordinate handrail reinforcement, control cutouts, ventilation and service access on equipment drawings. Do not fix rails or equipment to the decorative sheet alone without the approved support detail.
- Have the authorised lift contractor confirm the installation and removal method. Do not drill, weld or modify door equipment, cab structure or electrical components outside the agreed scope.
- Check panel joints, grain direction and the approved fixing sequence before final handover. Retain service access and clean the selected finish with nonabrasive, chlorine-free methods as instructed. Further guidance: Shop drawing and interface coordination
Delivery & Order Information+
Lead time :10–15 days after drawing confirmation (standard screen / ceiling / wall panel)
Minimum order : No fixed MOQ; feasibility assessed per project
Standards :Fabricated to ASTM A240 / EN 10088 material spec; finish per ASTM A480