Custom stainless steel elevator interiors
Gold & Copper-Tone Stainless Steel Elevator Door Surrounds
Gold and copper-tone stainless steel surrounds define lift entrances through sampled finishes, formed jamb covers and coordinated head details for hospitality and commercial interiors.
Product description+
Gold and copper-tone stainless steel entrance surrounds add a warm decorative edge to hotel and commercial lift lobbies. The examples show brushed and mirror-finish jambs, patterned headers and louvered portal treatments beside stone walls. These are architectural cladding options around the opening, not the lift's structural frame, operating door or drive equipment.
Choose the portal shape, visible joint layout and reflection level from the project elevation. Xinmao Metal can fabricate approved jamb covers, head panels and adjacent returns to suit confirmed opening dimensions and a finish sample. The interface drawing should identify call-station positions, original frame boundaries, door clearances and inspection access. Any metal facing attached to a moving door requires separate lift-contractor approval.
Project Questions
Which finish works well for stainless steel lift architraves?
Compare brushed or textured finishes for frequently touched edges, with mirror or PVD options where the design needs them. Approve a formed sample and grain direction.
How should scratches on coloured door surrounds be repaired?
Ask the original finish supplier to assess the damage. Local grinding may change the mirror appearance or remove the coloured layer; replacement may be preferable.
Interior package scope+
Cabin wall panels, doors, jambs, ceilings, skirting, trims and selected feature elements can be coordinated around approved elevator supplier information.
Information for review+
- Survey the original entrance and mark all fixed jamb, header and return components separately from moving door-facing areas.
- Approve formed edges, base texture and colour together, confirming the agreed cutting, bending, joining and finishing sequence before final fabrication release.
- Retain call-station and inspection access with the equipment clearances accepted by the lift contractor; do not use decorative covers to alter the original door system.
- Protect finished faces during fitting and obtain finish-supplier advice for any damage rather than grinding, welding or polishing coloured surfaces without approval. Further guidance: Architectural metal systems and project coordination
Delivery & Order Information+
Lead time :10–15 days after drawing confirmation (standard screen / ceiling / wall panel)
Minimum order : No fixed MOQ; feasibility assessed per project
Standards :Fabricated to ASTM A240 / EN 10088 material spec; finish per ASTM A480